1,800 meters long, 40 meters wide, crossing the Ismailia Canal as well as
the Om Kolthoum Road and Mohamed Aly Road.
includes the development of the entrances to the governorate of Ismailia .

Our Scope of Work Include Supply and installation for Post Tension System our Agency OVM.

Supply of Post Tension materials:
– Strands.
– Anchors.

Also, Supply of Post Tension equipment:
– Multi Stressing Jacks.
– Grouting Machines.

In conclusion, BETA’s scope of work in El Gafra Bridge – Development of the Suez Desert Road includes :
  • – The supply of the post-tensioning system.
    – Supervision of the post tensioning works.

Know more about our post tensioning projects in Egypt :

  • Owner

    Ministry of Defense - Engineering Authority of the Armed Forces

  • Category

    Bridges

  • Contractor

    H.A. Roads & Bridges

  • Completion Date

    Q42 2017

  • Consultant

    El-Raed Consulting Engineers

  • Location