• 256 Interior the good, New York
  • Supportyou@Interrio.com

(+321) 567 89 0123

About Project

Rod Elfarag West Bridge is a part of Rod ElFarag corridor which connects West Part of Egypt with the North .BETA’s scope of work includes the supply and supervision of the bridge pot bearing and PT works.

  • Owner

    Engineering Authority Of Armed Forces

  • Category

    Bridges

  • Contractor

    Arab Contractor

  • Completion Date

    Q2 2018

  • Consultant

    Moharram Bakhoum ACE

  • Location

    Warraa, Cairo