About Project

Our Scope of Work Include Supply and installation for Post Tension System our Agency OVM.

Supply of Post Tension materials:
– Strands.
– Anchors.

Also, Supply of Post Tension equipment:
– Multi Stressing Jacks.
– Grouting Machines.

In conclusion, BETA’s scope of work in Adly Mansour Bridge over the Nile includes :
  • – The supply of the post-tensioning system.
    – Supervision of the post tensioning works.
  • Owner

    Engineering Authority

  • Category

    Bridges

  • Contractor

    Samco National Construction Co.

  • Completion Date

    Q4 2019

  • Consultant

    A.C.E. Moharram - Bakhoum

  • Location

    Bani Sweif